Fees

Construction Permit Fees

Construction permit fees are based on the value of the work including labor, materials, site work, and design fees. No permit is required for cosmetic work only such as carpet, tile, painting, etc.

Valuation Fee
$7,000 and Less $75
>$7,000.00 to $15,000.00 $75 plus $5.00 per thousand
>$15,000.00 to $50,000.00 $150 plus $4.00 per thousand
>$50,000.00 to $100,000.00 $225 plus $3.00 per thousand
>$500,000.00 $600 plus $1.50 per thousand

General Permit Fees

Fee Description Fee
Sign Permit $75
Driveway Permit $75
Land Clearing Permit $125
Master Sign Plan $200
Floodplain Review $50
State Surcharge (BCAIF) 1.5% or $2 (whichever is greater on all permits)
State Surcharge (DBPR) 1% or $2 (whichever is greater on all permits)

Inspection Fees

Fee Description Fee
Inspection Fee $90 per inspection

Fire Fees

Fee Description  Fee
Building Plan Review $150
Sprinkler Plan Review $50 per floor
Alarm Plan Review $150
Hood System Review $50
Site Plan Review $150
Plan Revisions/Remodels $50
Stand Pipes (each) $50
Fire Pumps $50
Food Trucks $60
Underground Main $50
Tent/Temporary Building $60
Flow Tests $50
Fire Certification Letter $25
Occupancy Load $25
Temporary CO inspection $50
Final CO inspection 1st inspection no fee
Final CO reinspection $25
Fire Watch $100 per hour after four hours without sprinkler system working
Inspector Hourly Rate $50

Impact Fees for New Construction

Inside the City Limits

Residential

  • Water: Refer to Resolution Number 14-09-07 ($4,550)
  • Construction Water: Refer to Resolution Number 23-09-01 ($305)
  • Meter Price: Currently $1,000.00
  • Stormwater: Refer to Resolution Number 12-09-08 ($269.57)
  • Fire Impact Fee: (Commercial and Residential) Number 06-04-02 ($200)
  • Sewer: Refer to ordinance Number 14-09-06 ($2,830)

Multi Family

  • Water, Sewer and Meter required for each dwelling

Outside the City Limits

Residential

  • Water: Refer to Resolution Number 14-09-07
  • Construction Water: Refer to Resolution Number 23-09-01 ($305)
  • Meter: Current Price of all materials required to supply water

Commercial

All Construction

All new construction requires an 11 by 17 set of plans, and a digital set.